Roads and Drains Division Activities for Monday, June 30, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – Today will be another busy day for the team of the Roads and Drains Division of the Public Works Department on St. Kitts. Look out for them at the following locations:

  • Trinity – backfilling the retaining wall that was damaged during recent heavy rain.
  • Half Moon – preparing to cast a wing wall that was damaged by heavy rain.
  • The Southeast Peninsula – trimming overgrown hedges that extend to the road.

The Public Works Department urges drivers and pedestrians to exercise caution when travelling through these areas.

For more information from the Public Works Department, visit mopieudt.gov.kn and follow the department’s Facebook page.

Related articles

PWD’s Field Locations for January 26, 2026

Basseterre, St.Kitts (MoPIEUDT NEWS) – On Monday, January 26, 2026, the Public Works Department’s (PWD) Roads team will perform repair...

PWD’s Field Activities – January 23, 2026

Basseterre, St. Kitts (MoPIEUDT NEWS) – The Roads and Drains Division of the Public Works Department (PWD) in the...

PWD’s Field Activities – January 21, 2026

Basseterre, St.Kitts (MoPIEUDT NEWS) – On Wednesday, January 21, 2026, the Public Works Department’s (PWD) Roads team will continue repair...

PWD’s Field Activities – January 19, 2026

Basseterre, St.Kitts (MoPIEUDT NEWS) – On Monday, January 19, 2026, the Public Works Department’s (PWD) Roads team will perform repair...
Call Now Button