75.7 F
Basseterre

PWD Roads and Drains Division Activity for Tuesday, July 1, 2025

Date:

Basseterre, St. Kitts (MoPIEUDT NEWS) – The Roads and Drains Division of the Public Works Department (PWD) will engage in several activities at multiple locations around the island on Tuesday, July 1, 2025:

  • The asphalt crew will mill the roadway in Sandy Point, in the vicinity of the King Snack restaurant and the API Harowe building.
  • The asphalt crew will also continue its trimming and cutting of shrubs along the Southeast Peninsula.
  • The concrete crew will continue to construct a retaining wall in Trinity.
  • The concrete crew will also continue its preparations to cast the wing wall in Half Moon.

The PWD thanks the public for its cooperation and encourages drivers and pedestrians to exercise caution when travelling through these areas.

For more information, please visit mopieudt.gov.kn and follow Public Works Department St Kitts on Facebook.

Related articles

PWD Road Tracker – April 27, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – The Roads and Drains Division of the Public Works Department (PWD) will...

Notice of Roadwork at New Road Boulevard

Basseterre, Saint Kitts (Public Infrastructure News) - The Ministry of Public Infrastructure, Energy, and Utilities, through the Roads...

PWD Road Tracker – April 20, 2026

Basseterre, Saint Kitts (Public Infrastructure News) – The Roads and Drains Division of the Public Works Department (PWD) will...

Browse the PWD Road Tracker for April 13, 2026

Basseterre, St. Kitts (Public Infrastructure News) – The Roads and Drains Division of the Public Works Department (PWD) continued...
Call Now Button